Well this weekend we got back to work on getting some prep work done for the haunted house. Friday afternoon Brandon, Abraham, and myself got some work done on some new wall panels as well as getting our floor from last year cleaned up and prepped for reconstruction. We took all the boards from the floor and got all the screws and nails out of them, then at the end of the night my dad and I power washed all of them and cleaned them all up. Hopefully that way we can seal them and reuse them for this year!
Then today Kristin and Emily came over and we did some more work on the floor boards. We had some panels that were still assembled in storage so we drug them out and took them all apart and cleaned up all the boards.
Hopefully sometime this week I’ll get all the boards dried out and sealed up so I can get some floor panels put back together and back into storage. I’ll be sure to post any more updates if I do!